Burden Calculation Tables

2177t10.xlsx

NSPS for Stationary Combustion Turbines (40 CFR Part 60, Subpart KKKK) (Renewal)

Burden Calculation Tables

OMB: 2060-0582

Document [xlsx]
Download: xlsx | pdf

Overview

Summary
Table 1
Table 2
Capital O&M
Responses
Respondents


Sheet 1: Summary

ICR Summary Information
Hours per Response 43
Number of Respondents 1030
Total Estimated Burden Hours 106,000
Total Estimated Costs $14,500,000
Annualized Capital O&M Not Applicable
Total Annual Responses 2478
Form Number Not Applicable

Sheet 2: Table 1

Table 1: Annual Respondent Burden and Cost – NSPS for Stationary Combustion Turbines (40 CFR Part 60, Subpart KKKK) (Renewal)








T M C










141.75 172.41 71.36
Burden item (A)
Person hours per occurrence
(B)
No. of occurrences per respondent per year
(C)
Person hours per respondent per year (C=AxB)
(D) Respondents per year a (E)
Technical person- hours per year
(E=CxD)
(F)
Management person hours per year
(F=Ex0.05)
(G)
Clerical person hours per year
(G=Ex0.1)
(H)
Total Cost per year, $ b





1. Applications N/A











2. Surveys and studies N/A











3. Reporting requirements












A. Familiarization with Regulatory Requirements c 4 1 4 1030 4,121 206.1 412.1 $649,136.79




B. Required activities












Performance test d 12 1 12 280 3,363 168.2 336.3 $529,720.94




Fuel sampling – dual fuel turbines e 0.5 52 26 149 3,874 193.7 387.4 $610,184.88




Fuel sampling – distillate oil only turbines f 0.5 5 2.5 8 20.7 1.03 2.07 $3,259.53




C. Gather existing information See 3D











D. Write report












Notification of construction/ reconstruction g, h 2 1 2 42 83 4 8 $13,125.54




Notification of actual startup g, h 2 1 2 42 83 4 8 $13,125.54




Notification of performance test d 2 1 2 280 560.5 28.0 56.1 $88,286.82




Notification of demonstration of CEMS i 2 1 2 13 26 1.3 2.6 $4,095.17




Initial notification of compliance g, h 2 1 2 42 83 4 8 $13,125.54




Semiannual Compliance report j, k 8 2 16 1030 16,485 824 1649 $2,596,547.15




Subtotal for Reporting Requirements



33,006 $4,520,608




4. Recordkeeping requirements












A. Familiarization with Regulatory Requirement c See 3A











B. Train personnel h 40 1 40 42 1,667 83.3333333333333 166.666666666667 $262,510.83




C. Continuous monitoring












Record information k, l 5 12 60 1030 61,820 3,091 6,182 $9,737,051.83




Subtotal for Recordkeeping Requirements



73,010 $9,999,563




TOTAL LABOR BURDEN AND COST (rounded) m



106,000 $14,500,000


106,000
Capital and O&M Cost m






$0




Grand Total m






$14,500,000

43 hr/response














Assumptions:












a We have assumed that there is an annual average of 1030 sources currently subject to the regulations, including 989 existing respondents, and approximately 42 new respondents per year (rounded) who will become subject to the standards.




b This ICR uses the following labor rates: Managerial $172.41 ($82.10+ 110%); Technical $141.75 ($67.50 + 110%); and Clerical $71.36 ($33.98 + 110%). These rates are from the United States Department of Labor, Bureau of Labor Statistics, December 2023, “Table 2. Civilian workers by occupational and industry group.” The rates are from column 1, “Total compensation.” The rates are increased by 110 percent to account for varying industry wage rates and the additional overhead business costs of employing workers beyond their wages and benefits, including business expenses associated with hiring, training, and equipping their employees.


1030
c We have assumed that it will take 4 hours for respondents to familiarize with regulatory requirements and that all sources will have to familiarize with requlatory requirements.

Updating respondent assumptions (1030 avg was 871 in prev ICR renewal)

d We have assumed that 280 respondents will each take 12 hours to conduct annual stack testing to demonstrate compliance with NOx emission limitation.

was 237 3.68 280
e We have assumed that 149 respondents will each take 0.5 hours 52 times per year to complete fuel sampling for the dual fuel turbines.

was 126 6.91 149
f We have assumed that eight respondents will each take 0.5 hours 5 times per year to complete the fuel sampling for the distillate oil only turbines.









was 8 124 8
g We have assumed that it will take each new respondent 2 hours to write notification report.









was 15

h We have assumed that this is a one-time report for new respondents.












i We have assumed that of the 42 new respondents each year, 13 of these respondents will write reports demonstrating CEMS compliance.












j We have assumed that each of the respondents will take 8 hours twice per year to write the compliance report.












k The average number of respondents is 1030.












l We have assumed that it will take each respondent 5 hours twelve times per year to record information.












m Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.













Sheet 3: Table 2

Table 2: Average Annual EPA Burden and Cost – NSPS for Stationary Combustion Turbines (40 CFR Part 60, Subpart KKKK)(Renewal)









T M C











57.07 76.91 30.88
Activity (A)
EPA person- hours per occurrence
(B)
No. of occurrences per plant per year
(C)
EPA person- hours per plant per year
(C=AxB)
(D)
Plants per year a
(E)
Technical person-hours per year
(E=CxD)
(F)
Management person-hours per year
(F=Ex0.05)
(G)
Clerical person-hours per year
(G=Ex0.1)
(H)
Cost, $ b





Report Review












1. Notification of construction/reconstruction c 1 1 1 42 42 2 4 $2,666.81




2. Notification of actual startup d 0.5 1 0.5 42 21 1 2 $1,333.41




3. Notification of performance test 2 1 2 280 560 28.0 56.0 $35,841.96




4. Notification of demonstration of CEMS e 2 1 2 13 26 1.3 2.6 $1,664.09




5. Initial notification of compliance 2 1 2 42 83 4 8 $5,333.63




6. Semiannual compliance report f 2 1 2 1030 2061 103 206 $131,889.88




TOTAL ANNUAL BURDEN AND COST (rounded)g



3,210 $179,000


















Assumptions:












a We have assumed that there is an annual average of 1030 sources currently subject to the regulations, including 989 existing respondents, and approximately 42 new respondents per year (rounded) who will become subject to the standards.




b This cost is based on the average hourly labor rate as follows: Managerial $76.91 (GS-13, Step 5, $48.07 + 60%); Technical $57.07 (GS-12, Step 1, $35.67 + 60%); and Clerical $30.88 (GS-6, Step 3, $19.30+ 60%). This ICR assumes that Managerial hours are 5 percent of Technical hours, and Clerical hours are 10 percent of Technical hours. These rates are from the Office of Personnel Management (OPM), 2024 General Schedule, which excludes locality, rates of pay. The rates have been increased by 60 percent to account for the benefit packages available to government employees.




c We have assumed that new respondents will take one hour each to review the notification of construction/reconstruction report.




d We have assumed that it will take 0.5 hours for new respondents to review the actual startup report.





e We have assumed that of the 42 new respondents, only 13 of these respondents will review the notification of demonstration of CEMS report.




f We have assumed that it will take 2 hours once per year to review the compliance report.












g Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.













Sheet 4: Capital O&M

The only type of industry costs associated with the information collection activity in the regulations are labor costs. There are no capital/startup or operation and maintenance costs.

Sheet 5: Responses

Total Annual Responses
(A) (B) (C) (D) (E)
Information Collection Activity Number of Respondents Number of Responses Number of Existing Respondents That Keep Records But Do Not Submit Reports Total Annual Responses E=(BxC)+D
Notification of construction/reconstruction 42 1 0 42
Notification of actual startup 42 1 0 42
Notification of performance test 280 1 0 280
Notification of demonstration of CEMS 13 1 0 13
Initial notification of compliance 42 1 0 42
Semiannual compliance report 1030 2 0 2060



Total 2478

Sheet 6: Respondents









Number of Respondents


Respondents That Submit Reports Respondents That Do Not Submit Any Reports


(A) (B) (C) (D) (E)

Year Number of New Respondents a Number of Existing Respondents Number of Existing Respondents that keep records but do not submit reports Number of Existing Respondents That Are Also New Respondents Number of Respondents (E=A+B+C-D)

1 47 947 0 0 994

2 47 994 0 0 1041

3 31 1025 0 0 1056

Average 2 42 989 0 0 1030

1 New respondents include sources with constructed, reconstructed and modified affected facilities.  





2 Totals have been rounded to 3 significant figures. Figures may not add exactly due to rounding.




File Typeapplication/vnd.openxmlformats-officedocument.spreadsheetml.sheet
File Modified0000-00-00
File Created0000-00-00