BLM Form 3150-4 UNITED STATES FS Form 2800-16 DEPARTMENT OF THE INTERIOR (May 2015) BUREAU OF LAND MANAGEMENT DEPARTMENT OF AGRICULTURE FOREST SERVICE 
 NOTICE OF INTENT AND AUTHORIZATION TO CONDUCT GEOPHYSICAL EXPLORATION OPERATIONS  | 
				
					 FORM APPROVED OMB NO. 1004-0162 Expires: October 31, 2018  | 
			||||
NOI Case File No.  | 
			|||||
Project Name  | 
			|||||
Lessee or Operator  | 
				Geophysical Exploration Bond Holder  | 
			||||
Lessee or Operator Contact  | 
				
					  | 
			||||
Address  | 
				
					  | 
			||||
City  | 
				State  | 
				Which Agency holds the bond? BLM Forest Service  | 
			|||
Zip Code  | 
				Phone No. (Include area code)  | 
				Bond No.  | 
				Bond Amount: $  | 
			||
Email
	Address
	
	
Geophysical Co.  | 
			Geophysical Exploration Project Representative  | 
		||||
Address  | 
			Address  | 
		||||
City  | 
			State  | 
			City  | 
			State  | 
		||
Zip Code  | 
			Phone No. (Include area code)  | 
			Zip Code  | 
			Phone No. (Include area code)  | 
		||
Email Address  | 
			Representative’s Email Address  | 
		||||
	
Party
	Chief/Field
	Operations Point
	of
	Contact
	(POC)
		
POC Field Operations Cell Phone No. (Include area code) Email Address
	
	
A separate Plan of Operations is attached addressing items 1 – 5 below. Yes No.
	
	
Location Description and Maps: Give the general land description of the lands involved, limited to Meridian, Township, Range, and Section(s) or metes and bounds as appropriate. You must also submit an electronic map (in PDF) with a minimum scale of one-half inch per mile showing the general area and project location. We recommend a PDF version of a 7 1/2-minute USGS quadrangle or the scale commonly used in the area. In addition, you must submit GIS data in a locally projected Universal Transverse Mercator (UTM) North American Datum (NAD) 1983 ESRI shape file or geodatabase format (e.g., UTM zone 13N NAD83). Maps and GIS data must include clearly attributed locations of operations and facilities, including staging areas, access routes to and within the project area, source and receiver point locations and lines, shot point locations, surface ownership, Federal minerals, and any Federal lands under lease. You must identify separately the number of Federal surface (by agency), state surface, fee surface, and other surface acres within the project area, and the estimated acreage of surface disturbance.
	
	
	
	
	
	
	
	
	
	
	
	
	
	
		
Do
		you
		hold
		any Federal
		leases
		within
		the project
		area?	Yes	No
		(If
		yes,
		indicate
		location
		and
		lease
		numbers
		on
		an
		attached
		map.)
		There
		is no
		fee
		for
		operations
		conducted
		on
		your
		Federal
		lease
		(outside
		of Alaska).
If you are proposing seismic exploration, how many miles of source line (2-D), or acres (3-D) (to the nearest 10 acres) of survey are on:
	
	
Your
			Federal
			Lease	b.
			Other
			Federal
			lands
			 	
	
When do you expect to start exploration?
How long will the project last?
days.
Describe any of your critical timeframes associated with the proposed project, such as equipment or contractor availability.
	
	
	
	
	
	
Title
	18 U.S.C.
	Section
	1001
	and
	Title
	43 U.S.C.
	Section
	1212
	make
	it a
	crime
	for
	any person
	knowingly
	and willfully
	to make
	to any
	Department
	or
	agency
	of
	the United
	States
	any
	false,
	fictitious,
	or
	fraudulent
	statements
	or
	representations
	as to
	any
	matter
	within
	its
	jurisdiction.
	
	
(Continued on page 2)
5.
Description
and
Type
of
Operations
(check
all
that
apply);
Survey Type: 2-D 3-D Gravity/Magnetic Other (explain):
Additional information on the survey type:
Survey Method: Shot hole Vibroseis Other (explain):
For shot holes:
What type and amount of explosives per source will you use? What shot point pattern and spacing will you use?
What will be the shot hole depth?
What type of receivers (wired/wireless) will you use and how will they be transported and placed?
What will be the receiver and source spacing (in feet) and spacing between the source and receiver (in feet)? Additional information on the survey method:
Seismic Source and Transport Methods: Vibroseis Trucks Pick-up Truck Drill Buggy ATV/UTV Helicopter Backpack
Describe your seismic source and transportation plans, including types of vehicles, numbers of vehicles for each aspect of the project, routes, and methods you will use to access the project area:
Operating Procedures: Describe your operating procedures, including how you will minimize surface impacts and ensure compliance with the Terms and Conditions of this NOI. Describe staging areas and support facilities you need, such as helispots, temporary camps, equipment storage; fuel storage; powder magazines; construction of roads or trails; proposed plugging procedures for shot holes; waste management and spill prevention; reclamation; and general clean-up procedures.
(Continued
on
page
3)	(BLM
Form
3150-4
and
FS Form
2800-16,
page
2)
Terms
and
Conditions
The
		Bureau
		of
		Land
		Management
		(BLM)
		or
		Forest
		Service
		(FS) (Agency)
		must
		approve
		any
		Surface
		disturbing
		activities
		in addition
		to those
		approved
		in the
		NOI,
		such
		as
		route
		changes,
		placement
		of magazines,
		towing
		with
		a tractor,
		blading,
		dozing,
		snow
		removal,
		and
		vegetation
		removal.
		I must
		notify
		the
		Agency
		in writing
		of
		any changes
		in the
		original
		proposal
		and
		have
		Agency
		approval
		in writing
		for
		the
		changes
		before
		proceeding
		with
		them.
		Stacking
		source
		points
		to avoid
		sensitive
		resources
		or
		areas
		does
		not
		require
		prior
		Agency
		approval.
	
	
This NOI expires on , unless the Agency extends it in writing before that date.
I understand that this NOI does not grant any exclusive right to the described lands for geophysical exploration, or other purposes. The land area described above is at all times subject to any other lawful uses by the United States, its lessees, permittees, licensees, and assigns.
I must notify the Agency at least days, but no more than
days, prior to initiating the project and entering upon lands managed by the Agency.
In the field, each seismic crew must have a copy of the approved NOI and its terms and conditions.
The Agency may suspend or terminate this NOI if there is a violation of any of its conditions.
I must suspend operations when the operations may unnecessarily damage the surface, such as when rutting would occur due to wet soil conditions.
I must indemnify the United States for any liability for damage to life or property resulting from the occupancy or use of public lands under the NOI.
I must take all reasonable precautions to prevent and suppress fires. The Agency may specify in writing the fire prevention and firefighting equipment I need. At my expense, I must extinguish all fires set or caused as a result of operations under this NOI and must report all fires to the Agency.
I must diligently protect from unnecessary damage United States land and property covered by this NOI. I must pay the United States for any damage resulting from my or my agents’ or employees’ violation of the terms of this NOI or any law or regulation applicable to the lands involved.
I must store and handle powder magazines and explosives according to the U. S. Bureau of Alcohol, Tobacco and Firearms standards (see 27 CFR Part 555). I must properly secure loaded shot holes.
I must complete shot hole plugging under Agency guidelines and the guidelines of any other local, Federal, or State regulatory authority.
I must remove all materials and equipment I placed on the premises and restore the site to the Agency’s satisfaction immediately after I complete the project unless the Agency approves other arrangements.
I must file a Notice of Completion (NOC) Form 3150-5/2800-16a within 30 days after completing operations and reclamation. If the location of the project is different from that in the approved NOI, I must submit a revised map with the NOC (1:24,000 scale, where available), including source points.
I must pay to the United States $__________________________per __________________________according to the regulations.
This geophysical exploration project is subject to the attached Conditions of Approval ________________________ through ____________________and Exhibits _______________._________
	
	
	
WARNING:
	If
	you
	purposely
	give
	false
	or
	misleading
	information,
	you
	may
	be
	fined
	$10,000,
	sent
	to
	prison,
	or
	both
	(see
	Title
	18
	U.S.C.
	1001
	statement
	on
	page
	1).
	
	
I agree that I and my agents must conduct the geophysical exploration under all Federal, State, local laws, and applicable regulations, and I and my agents must comply with this NOI and any attached terms and conditions.
	
	
Printed Name of Authorized Company Representative Signature of Authorized Company Representative Date
	
	
	
Printed
	Name
	of
	Agency
	Signing
	Officer	Signature
	of
	Agency
	Signing
	Officer	Title
	of
	Agency
	Signing
	Officer	Date
	
	
NOTICES
AUTHORITY: This information is solicited under the authority of the Mineral Leasing Act (30 U.S.C. 181 – 287), Mineral Leasing Act for Acquired Lands (30 U.S.C. 341 – 359), Federal Land Policy and Management Act of 1976 (43 U.S.C. 1701 – 1782), and National Environmental Policy Act (42 U.S.C. 4321 – 4347). The BLM collects this information in accordance with 43 CFR parts 3150 and 3160. The FS collects this information in accordance with 36 CFR part 228 and 251.
PURPOSE: The primary purpose for collecting this information is to facilitate the timely processing of your notice and inform you of the terms and conditions under which geophysical exploration operations may be conducted.
ROUTINE USES: This information may be disclosed to agencies, organization or persons for authorized purposes as follows: (1) Documentation for public information in support of notations made on land status, records for the management, and use of public lands and resource. (2) Information from the record and/or the record will be transferred to appropriate Federal, State, local or foreign agencies, when relevant to civil, criminal or regulatory investigations or prosecutions. Additional information on authorized routine uses may be found in the published system of records notice, BLM-3, Mineral Lease Management—Interior, which may be viewed at https://www.doi.gov/privacy/blm_notices
DISCLOSURE: Furnishing the information on this form is voluntary, however, failure to submit all or part of the requested information or to complete this form may result in delay or result in revocation of your right to conduct geophysical exploration operations.
The Paperwork Reduction Act of 1995 requires us to inform you that:
The BLM/FS will use this information to process geophysical exploration notices.
Response to this request is required to obtain or retain a benefit.
The BLM/FS would like you to know that you do not have to respond to this or any other Federal agency-sponsored information collection unless it displays a currently valid OMB control number.
	
	
BURDEN HOURS STATEMENT: The public reporting burden for this form is 1 hour per response, including the time for reviewing instructions, gathering and maintaining data, and completing and reviewing the form. You may submit comments regarding the burden estimate or any other aspect of this form to U.S. Department of the Interior, Bureau of Land Management (1004-0162), 1849 C Street, NW, Room 2134LM, Attention: Information Collection Clearance Officer, Washington, D. C. 20240.
	
	
	
(BLM
	Form
	3150-4
	and
	FS Form
	2800-16,
	page
	3)
| File Type | application/vnd.openxmlformats-officedocument.wordprocessingml.document | 
| File Title | Notice of Intent and Authorization to Conduct Oil and Gas Geophysical Exploration Operations | 
| Subject | Form Notice of Intent and Authorization to Conduct Oil and Gas Geophysical Exploration Operations | 
| Author | Teresa Thompson | 
| File Modified | 0000-00-00 | 
| File Created | 2021-01-21 |