Download: 
pdf | 
pdfU. S. DOT CROSSING INVENTORY FORM  (Draft as of 12/11/2014) 
DEPARTMENT OF TRANSPORTATION 
FEDERAL RAILROAD ADMINISTRATION 
 
 
 
 
 
 
 
 
 
 
                OMB No. 2130‐0017 
Instructions for the initial reporting of the following types of new  or previously unreported crossings: For  public highway‐rail grade crossings,  complete the entire inventory 
Form.  For  private  highway‐rail  grade  crossings,  complete  the  Header,  Parts  I  and  II,  and  the  Submission  Information  section.  For  public  pathway  grade  crossings  (including 
pedestrian station grade crossings), complete the Header, Parts I and II, and the Submission Information section. For Private pathway grade crossings, complete the Header, 
Parts I and II, and the Submission Information section. For grade‐separated highway‐rail or pathway crossings (including pedestrian station crossings), complete the Header, Part 
I,  and  the  Submission  Information  section.  For  changes  to  existing  data,  complete  the  Header,  Part  I  Items  1‐3,  and  the  Submission  Information  section,  in  addition  to  the 
updated data fields. Note: For private crossings only, Part I Item 20 and Part III Item 2.K. are required unless otherwise noted.                     An asterisk * denotes an optional field. 
A. Revision Date 
B. Reporting Agency  
C. Reason for Update (Select only one)
D. DOT Crossing 
(MM/DD/YYYY) 
Inventory Number 
 Railroad  
 Transit      Change in   New 
 Closed
 No Train 
 Quiet 
_____/_____/_________ 
Data  
Crossing 
Traffic 
Zone Update 
 State   
 Other     Re‐Open
 Date 
 Change in Primary   Admin. 
 
Change Only  Operating RR 
Correction 
Part I: Location and Classification Information 
1. Primary Operating Railroad 
2. State
3. County 
_____________________________________________________ 
________________________________ 
____________________________________ 
4. City / Municipality 
5. Street/Road Name & Block Number   
6. Highway Type & No. 
 In 
  ________________________________|  __________________ 
 
 Near       __________________________ 
  (Street/Road Name)                                    |* (Block Number)    
_______________________________________ 
7. Do Other Railroads Operate a Separate Track at Crossing?    Yes     No  
8. Do Other Railroads Operate Over Your Track at Crossing?    Yes     No    
    If Yes, Specify RR 
    If Yes, Specify RR 
                              ____________,  ____________,  ____________, _____________                                                 ____________,  ____________,  ____________, _____________ 
9. Railroad Division or Region 
10. Railroad Subdivision or District
11. Branch or Line Name
12. RR Milepost
 
 
 
_______|____________|____________ 
 None        _______________________   None        _______________________ 
 None        _______________________ 
(prefix)  |  (nnnn.nnn)       |  (suffix) 
13. Line Segment 
14. Nearest RR Timetable 
15. Parent RR  (if applicable)
16. Crossing Owner (if applicable)
 
      * 
Station        * 
 
 N/A        _________________________________ 
_________________________ 
__________________________ 
 N/A        _____________________________ 
17. Crossing Type 
22. Average Passenger 
18. Crossing Purpose  19. Crossing Position 
20. Public Access
21. Type of Train
 
Train Count Per Day 
 Highway 
 At Grade 
(if Private Crossing) 
 Freight 
 Transit 
 Public 
 Pathway, Ped. 
 RR Under 
 Yes 
 Intercity Passenger   Shared Use Transit   Less Than One Per Day 
 Tourist/Other 
 Private 
 Number Per Day_____ 
 Station, Ped. 
 RR Over 
 No 
 Commuter 
23. Type of Land Use 
 Open Space              Farm               Residential              Commercial              Industrial               Institutional              Recreational               RR Yard  
24. Is there an Adjacent Crossing with a Separate Number? 
25. Quiet Zone   (FRA provided)
 
 
 Yes      No        If Yes, Provide Crossing Number __________________ 
 No      24 Hr      Partial       Chicago Excused              Date Established  _________________ 
26.  HSR Corridor ID 
27. Latitude in decimal degrees 
28. Longitude in decimal degrees
29. Lat/Long Source
 
 
 
 
__________________ N/A  
(WGS84 std:   nn.nnnnnnn) 
(WGS84 std:   ‐nnn.nnnnnnn) 
 Actual         Estimated    
30.A.  Railroad Use   * 
31.A.  State Use   *
 
 
30.B.  Railroad Use   * 
31.B.  State Use   *
 
 
30.C.  Railroad Use   * 
31.C.  State Use   *
 
 
30.D.  Railroad Use   * 
31.D.  State Use   *
 
 
32.A.  Narrative  (Railroad Use)  * 
32.B.  Narrative (State Use)  *
 
 
33. Emergency Notification Telephone No. (posted) 
35.  State Contact  (Telephone No.)
34. Railroad Contact  (Telephone No.)
 
 
 
______________________________________ 
_________________________________ 
_________________________________ 
Part II: Railroad Information 
1. Estimated Number of Daily Train Movements 
1.A.  Total Day Thru Trains 
1.B.  Total Night Thru Trains  1.C. Total Switching Trains
1.D. Total Transit Trains
1.E. Check if Less Than 
(6 AM to 6 PM) 
(6 PM to 6 AM) 
 
 
One Movement Per Day                  
__________ 
__________ 
__________ 
__________ 
How many trains per week?  ______ 
2. Year of Train Count Data (YYYY) 
3. Speed of Train at Crossing
 
3.A. Maximum Timetable Speed (mph)  __________ 
__________ 
3.B. Typical Speed Range Over Crossing (mph)   From __________ to __________ 
4. Type and Count of Tracks 
 
Main __________     Siding __________     Yard __________     Transit __________     Industry __________ 
5. Train Detection (Main Track only) 
        Constant Warning Time       Motion Detection     AFO     PTC       DC       Other       None 
6.  Is Track Signaled? 
7.A.  Event Recorder
7.B.  Remote Health Monitoring
        Yes       No 
        Yes       No 
        Yes       No 
FORM FRA F 6180.71 (Rev. 9/14) 
 
 
OMB approval expires 9/30/2015                                                Page 1 OF  2
 
U. S. DOT CROSSING INVENTORY FORM  (Draft as of 12/11/2014) 
A. Revision Date (MM/DD/YYYY) 
D. Crossing Inventory Number (7 char.)
PAGE 2 
Part III: Highway or Pathway Traffic Control Device Information 
1. Are there 
Signs or Signals? 
 
 Yes     No 
2. Types of Passive Traffic Control Devices associated with the Crossing
2.A. Crossbuck 
Assemblies (count) 
 
2.E. Low Ground Clearance Sign 
(W10‐5) 
  Yes  (count_______)  
  No 
2.B. STOP Signs (R1‐1) 
(count) 
2.C. YIELD Signs (R1‐2) 
(count) 
2.F. Pavement Markings 
 Stop Lines 
 RR Xing Symbols 
Dynamic Envelope
 None 
2.J. Other MUTCD Signs                              Yes     No    
Specify Type  _______________ 
Specify Type _______________ 
Specify Type _______________ 
2.D. Advance Warning Signs (Check all that apply; include count)         None
 W10‐1 ________
 W10‐3 ________  W10‐11 __________
 W10‐2 ________
 W10‐4 ________  W10‐12 __________
2.G. Channelization 
2.H. EXEMPT Sign 
2.I. ENS Sign (I‐13)
Devices/Medians 
(R15‐3) 
Displayed  
 Yes 
 Yes 
 All Approaches
 Median
 No 
 No 
 One Approach 
 None 
2.K. Private Crossing 
Signs (if private) 
 
 Yes     No 
Count  __________ 
Count  __________ 
Count  __________ 
2.L. LED Enhanced Signs (List types)
 
 
3. Types of Train Activated Warning Devices at the Grade Crossing (specify count of each device for all that apply) 
3.A. Gate Arms 
3.B. Gate Configuration 
3.C. Cantilevered (or Bridged) Flashing Light 
3.D. Mast Mounted Flashing Lights 
(count) 
Structures (count) 
(count of masts) _________ 
 
 2 Quad 
 Full (Barrier) 
Over Traffic Lane        _____
 Incandescent
 Incandescent 
 LED
Roadway   _____   3 Quad 
Resistance 
 
 
 Back Lights Included 
 Side Lights 
Pedestrian _____   4 Quad 
 Median Gates 
Not Over Traffic Lane _____   LED 
Included 
3.F. Installation Date of Current  
Active Warning Devices: (MM/YYYY) 
______/___________                    Not Required 
3.G. Wayside Horn  
  Yes  
  No 
Installed on (MM/YYYY) ______/__________
3.J. Non‐Train Active Warning 
 Flagging/Flagman  Manually Operated Signals    Watchman   Floodlighting   None 
4.A. Does nearby Hwy 
Intersection have 
Traffic Signals? 
 
 Yes     No 
4.B. Hwy Traffic Signal 
Interconnection 
  Not Interconnected 
  For Traffic Signals 
  For Warning Signs 
3.H. Highway Traffic Signals Controlling 
Crossing 
 Yes     No 
4.C. Hwy Traffic Signal Preemption
  Simultaneous
  Advance 
3.E. Total Count of 
Flashing Light Pairs 
3.I. Bells 
(count) 
3.K. Other Flashing Lights or Warning Devices
Count ___________     Specify type   ______________________ 
5. Highway Traffic Pre‐Signals
  Yes       No 
 
Storage Distance *     ____________ 
Stop Line Distance *  ____________ 
6. Highway Monitoring Devices
(Check all that apply) 
  Yes ‐ Photo/Video Recording 
  Yes – Vehicle Presence Detection 
  None 
Part IV: Physical Characteristics 
1. Traffic Lanes Crossing Railroad      One‐way Traffic 
2.  Is Roadway/Pathway 
3.  Does Track Run Down a Street? 
4.  Is Crossing Illuminated?  (Street 
                                                 Two‐way Traffic 
Paved? 
lights within approx. 50 feet from 
 
Number of Lanes   _______                 Divided Traffic 
 Yes          No
nearest rail)   Yes          No 
 Yes          No
5.  Crossing Surface (on Main Track, multiple types allowed)     Installation Date * (MM/YYYY)  _______/__________     Width * ______________   Length * _______________
  1  Timber        2  Asphalt        3  Asphalt and Timber        4  Concrete        5  Concrete and Rubber        6  Rubber        7  Metal       
  8  Unconsolidated        9  Composite       10  Other (specify)  ________________________________________________________           
6.  Intersecting Roadway within 500 feet? 
 
  Yes        No      If Yes, Approximate Distance (feet) _________________ 
7.  Smallest Crossing Angle
 
  0° – 29°          30° – 59°             60° ‐ 90°      
8.  Is Commercial Power Available? *
 
 Yes          No 
Part V: Public Highway Information 
3. Is Crossing on State Highway 
4. Highway Speed Limit
1. Highway System 
2. Functional Classification of Road at Crossing
System? 
___________  MPH 
 
  (0)  Rural      (1)  Urban 
  Yes        No 
 Posted     Statutory 
  (01) Interstate Highway System 
  (1) Interstate                               (5) Major Collector 
  (02) Other Nat Hwy System (NHS) 
  (2) Other Freeways and Expressways 
5. Linear Referencing System (LRS Route ID)  *
  (3) Other Principal Arterial       (6) Minor Collector 
  (03) Federal AID, Not NHS 
6. LRS Milepost  * 
  (4) Minor Arterial                       (7) Local 
  (08) Non‐Federal Aid 
7.  Annual Average Daily Traffic  (AADT) 
8.  Estimated Percent Trucks
9.  Regularly Used by School Buses?
10.  Emergency Services Route
Year  _______    AADT  _____________ 
___________________  % 
 Yes          No   Average Number per Day  ___________ 
 Yes          No 
Submission Information ‐ This information is used for administrative purposes and is not available on the public website. 
 
Submitted by  __________________________________     Organization _______________________________________     Phone  _______________      Date  _____________ 
Public reporting burden for this information collection is estimated to average 30 minutes per response, including the time for reviewing instructions, searching existing data 
sources, gathering and maintaining the data needed and completing and reviewing the collection of information.  According to the Paperwork Reduction Act of 1995, a federal 
agency may not conduct or sponsor, and a person is not required to, nor shall a person be subject to a penalty for failure to comply with, a collection of information unless it 
displays a currently valid OMB control number.  The valid OMB control number for information collection is 2130‐0017.  Send comments regarding this burden estimate or any 
other aspect of this collection, including for reducing this burden to:  Information Collection Officer, Federal Railroad Administration, 1200 New Jersey Ave. SE, MS‐25 
Washington, DC 20590. 
FORM FRA F 6180.71 (Rev. 9/14) 
 
 
OMB approval expires 9/30/2015                                                Page 2 OF  2 
| File Type | application/pdf | 
| File Title | Microsoft Word - 141211 edit BFG New Inv Form.docx | 
| Author | brian.gilleran | 
| File Modified | 2014-12-15 | 
| File Created | 2014-12-11 |