| U. S. Department of Transportation | 
 | STATE: | 
 | 
	
		| Federal Highway Administration | 
 | 
 | 
 | 
	
		| 
 | 
 | 
 | 
	
		| 
 | 
 | YEAR ENDING (mm/yy): | 
 | 
	
		| STATE HIGHWAY CAPITAL OUTLAY | 
 | 
 | 
	
		| AND MAINTENANCE EXPENDITURES | 
 | 
	
		| NOTE: This collection of information is required by 23 U.S.C. 104 (b) and 105 (b); and 23 C.F.R. 1.5 and 420.105(b).  Public reporting burden is estimated to average126 hours per response. The Guide data is used by FHWA in administering the Federal-Aid Highway Program; in assessing highway policies, programs and performance of the Nation’s highway transportation system; in identifying future highway system investment needs; and in making policy and program recommendations.  Please note that an agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.  The OMB control number for this collection is 2125-0032, which expires on XX/XX/XXXX. | 
 | AREA AND FUNCTIONAL SYSTEM: | 
 | 
	
		| 
 | 
 | 
 | 
 | 
	
		| 
 | 
 | 
 | 
 | 
	
		| 
 | 
 | 
 | 
 | 
	
		| EXPENDITURES | ON NATIONAL | OFF NATIONAL | 
 | 
	
		| BY IMPROVEMENT TYPES | HIGHWAY SYSTEM | HIGHWAY SYSTEM | TOTAL | 
	
		| 
 | 
 | 
 | 
 | 
	
		| I.  CAPITAL OUTLAY | 
 | 
 | 
 | 
	
		| A.  NEW FACILITIES | 
 | 
 | 
 | 
	
		| 1.  RIGHT-OF-WAY COSTS | 
 | 
 |  | 
	
		| 2.  ENGINEERING COSTS | 
 | 
 |  | 
	
		| 3.  CONSTRUCTION OF NEW ROADS | 
 | 
 |  | 
	
		| 4.  CONSTRUCTION OF NEW BRIDGES | 
 | 
 |  | 
	
		| 5.  TOTAL |  |  |  | 
	
		| B.  CAPACITY ADDITIONS TO EXISTING FACILITES | 
 | 
 | 
 | 
	
		| 1.  RIGHT-OF-WAY COSTS | 
 | 
 |  | 
	
		| 2.  ENGINEERING COSTS | 
 | 
 |  | 
	
		| 3.  RELOCATION WITH ADDED CAPACITY | 
 | 
 |  | 
	
		| 4.  RECONSTRUCTION WITH ADDED CAPACITY | 
 | 
 |  | 
	
		| 5.  MAJOR WIDENING | 
 | 
 |  | 
	
		| 6.  BRIDGE REPLACEMENT WITH ADDED CAPACITY | 
 | 
 |  | 
	
		| 7.  BRIDGE REHABILITATION WITH ADDED CAPACITY | 
 | 
 |  | 
	
		| 8.  TOTAL |  |  |  | 
	
		| C.  SYSTEM PRESERVATION | 
 | 
 | 
 | 
	
		| 1.  RIGHT-OF-WAY COSTS | 
 | 
 |  | 
	
		| 2.  ENGINEERING COSTS | 
 | 
 |  | 
	
		| 3.  RELOCATION WITH NO ADDED CAPACITY | 
 | 
 |  | 
	
		| 4.  RECONSTRUCTION WITH NO ADDED CAPACITY | 
 | 
 |  | 
	
		| 5.  RESTORATION, REHABILITATION, & RESURFACING | 
 | 
 |  | 
	
		| 6.  MINOR WIDENING | 
 | 
 |  | 
	
		| 7.  BRIDGE REPLACEMENT WITH NO ADDED CAPACITY | 
 | 
 |  | 
	
		| 8.  BRIDGE REHABILITATION WITH NO ADDED CAPACITY | 
 | 
 |  | 
	
		| 9.  TOTAL |  |  |  | 
	
		| D.  SYSTEM ENHANCEMENT AND OPERATION | 
 | 
 | 
 | 
	
		| 1.  ENGINEERING COSTS | 
 | 
 |  | 
	
		| 2.  SAFETY IMPROVEMENTS | 
 | 
 |  | 
	
		| 3.  TRAFFIC MANAGEMENT / TRAFFIC ENGINEERING | 
 | 
 |  | 
	
		| 4.  ENVIRONMENTAL IMPROVEMENTS | 
 | 
 |  | 
	
		| 5.  OTHER ENHANCEMENTS | 
 | 
 |  | 
	
		| 6.  TOTAL |  |  |  | 
	
		| E.  TOTAL CAPITAL OUTLAY (Lines A + B + C + D) |  |  |  | 
	
		| II.  MAINTENANCE | 
 | 
 |  | 
	
		| FORM FHWA-534 (Rev. 06-2000) | PREVIOUS EDITIONS OBSOLETE | 
 | Excel |